CORRIN TETHER — Space Elevator Cable Desk

CORRIN TETHER — the cable dynamics desk of a 96,000-km space elevator. A stalled climber on the belly of the third mode, a standing wave growing twenty-seven metres an hour, eighteen climbers to re-phase. A cinematic FUI scene from SCENESCAPES Channel 26.

◀ SCENESCAPES / 26 / CORRIN TETHER
T−12:51
ENVELOPE @ MIDPOINTBREACH CST 16:03 · 1,200 m
RE-PHASE PLAN · P(SUCCESS) 0.71
AWAITING AUTH REQ #3 · L4
C-19 STALLED 23,140 km · 6 SOULS
STALL 10:57:29 · SINCE 19:33 D−1 · PICKUP DEAD
MODE 3 · 191.40 m · +27.3 m/h · ENVELOPE 1,200 m
sigma_3 +0.1429 h^-1 · e-FOLD 7.00 h · 16.0 % OF ENVELOPE
CST03:09:53
DAY 27 h 18 m · SYNC 31,400 km
OFFICER EKWUEME-RÍOS, T.
L3 · SHIFT B · ON DESK 07:41
CORRIN TETHER · CABLE DYNAMICS DESK · CD-1 · 96,000 km
AALT · GN
PIECEWISE km
BTHE CABLE · MODE 3
T_3 5 h 19 m · PHASE 000° · d(A2) +0.0 m
CMODAL SPECTRUM · M1–8RUN 4,412
M3 191.40 mLOG m · SSI-COV · df 0.8 µHz
GROWTH TREND · MODE 3k 0.1429 h^-1 · R² 0.998
T−12:51h SINCE STALL · 20-min EPOCHS · EXTRAPOLATED
ERE-PHASE PLAN · RP-3 · 18 CLIMBERSVARIANT 1/7 · GAIN 0.84 · LEAD 12°
AUTH REQUEST #3 · PENDING · L4MODAL-LQ v4.2 · CORIOLIS DAMPING · dv AT f_3 · SORTED BY ALTITUDE ↑
AFTER 6 h172mAT CST 09:12
AFTER 12 h148mAT CST 15:12
AFTER 24 h96mAT CST 27:12
P(SUCCESS) · RP-30.71MC 2,000 · CI 0.66–0.76 · L4
DCLIMBER ROSTER 19 ON CABLE · 9 ↑ 9 ↓ · SORT ALT
FANCHOR CAY · POWER · CAPSTONE EQ 0.00° · 212.40° E · PAD 2
SEA STATE3SLIGHT
Hs · Tp1.21m 7.4s
WIND14.0m/s 118°
GUST 10 m16.8m/s
SWAY0.42m RMS
HEAVE · PITCH0.31m 0.62°
BARO1,009.8hPa
SPRAY0.49g/m³
TENSION @ MIDPOINT62.10/ 74 GN
STATIC 61.79 + DYN 0.31 + THERM +0.00 GNLIMIT 74.00 GN · +0.089 GN/h
MIDPOINT LATERAL21.3/ 133 m
DOCKING ARMS4/4LOCKED
phi_3 @ MIDPOINT0.111547 km > N2
CAPSTONE96,000km
INCL0.040°
LIBRATION dr+0.62km
T @ CAPSTONE31.85GN